Scheduling Loads and Updates

How to:

PMF allows scheduling loads. Recalculation is performed automatically when data from sources has changed. The recalculation can be made to run during the daytime, whenever you choose, or nightly, on schedule.

Typically, you would schedule only the following:

PMF populates the model. Scheduling no longer requires you to schedule individual measure loads. You need to only schedule source loads, and PMF automatically does the rest.



Procedure: How to Schedule Source Loads

To schedule a source load:

  1. In the Manage page, click the Sources panel button.
  2. Select the source you want to schedule.
  3. Click Schedule.

    The New Schedule panel opens, as shown in the following image.

    New Schedule panel
  4. Specify when the schedule should run.
  5. Click Save.

WebFOCUS