Editing a Schedule in the Basic Scheduling Tool

How to:

From the tree, you can edit the schedules you are authorized to access.


Top of page

x
Procedure: How to Edit a Schedule in the Basic Scheduling Tool
  1. Right-click the schedule you want to edit and select Edit.

    If the user is authorized to use the Advanced Scheduling tool, the Advanced Scheduling tool is used to edit schedules, as shown in the following image.

    edit a schedule

    Note: The Email and Print distribution methods support multiple tasks.

  2. Make the required changes to the schedule. For details on the Basic Scheduling tool options, see Creating a Schedule in the Basic Scheduling Tool.
  3. Click Save & Close.

Top of page

x
Reference: Considerations When Editing a Schedule in the Basic Scheduling Tool

WebFOCUS